Pick the engagement that fits your go-to-market
Executive Summary
Chart Mate has reviewed the RFQ for a multi-category, large-volume bag program . As a direct bag manufacturer in Guangdong with 150 production workers and 3,000 pcs/day capacity, we are structured to absorb multi-category programs of this scale under a single production plan and a single quality system — without splitting your order across multiple factories.
Program Snapshot
Category |
Quantity |
Material (recommended) |
Production Lead Time |
MOQ |
Large luggage (26") |
{2,650 } pcs |
600D Polyester + PU coating (soft-shell) |
35–45 days |
500 |
Cabin luggage (18") |
{2,650 } pcs |
600D Polyester + PU coating |
30–40 days |
500 |
Waist bags |
{2,650 } pcs |
Oxford / Nylon |
20–28 days |
500 |
Drawstring bags |
{2,650} pcs |
210D Polyester |
15–22 days |
500 |
Travel bags |
{1,100 } pcs |
600D / Canvas |
25–35 days |
500 |
Toiletry bags |
{1,100} pcs |
PU / Nylon |
20–28 days |
500 |
Lanyards |
{3,200 } pcs |
Polyester dye-sub |
10–18 days |
1,000 |
Pricing Structure
All quotations in USD, valid for 30 days.
- EXW Shenzhen — factory-gate price; buyer arranges transport.
- FOB Yantian — includes domestic transport + ocean freight to named port.
Detailed unit prices will be issued in a separate itemized quotation sheet within 48 hours of receiving the three clarifications requested above.
Color & Material Discipline
Your specified Pantone references will be matched against our in-house Pantone Solid Chips Coated & Uncoated (PLUS Series) library. Production batch-to-shipment color drift is held to ΔE < 2, verified under D65 light during pre-shipment inspection. Lab report available on request. The same color discipline applies to any custom Pantone reference on the other categories.
Production Plan (calendar days, from quotation confirmation)
- Day 1–3 — Itemized quotation issued; clarifications locked.
- Day 5–14 — Counter-samples for each category, couriered DHL / FedEx. Up to 2 rounds of free revisions per SKU.
- Day 15–20 — Sample sign-off (golden sample), PO confirmed, 30% T/T deposit received.
- Day 21–55 — Production. In-line QC at 30%, 60%, and 90% milestones, with photo reports shared with your team.
- Day 56–70 — Pre-shipment inspection, document preparation (PL, CI, COO, B/L), DDP shipment from Yantian via Colombo to {DESTINATION}. Door-delivered in 18–25 days from sailing.
Key Assumptions & Deviations
- Large luggage assumes soft-shell. If hard-shell (PC/ABS) is required, we will partner with a sister factory and flag this transparently in the quotation, including any price impact. Large-format capacity is subject to confirmation against your spec.
- All prices exclude destination-side tariffs unless explicitly listed in the DDP column.
- Pantone references to be confirmed by client; alternative color cards may extend sample lead time by 3–5 days.
- Branding / logo setup: 1 color included; additional colors add USD 0.05–0.15 per piece depending on technique (silkscreen / embroidery / heat transfer / sublimation).
- Custom hardware (zippers, buckles, logo plates) quoted separately; lead time impact +7–10 days for tooling.
Payment Terms
- 30% T/T deposit upon PO confirmation.
- 70% balance against B/L copy.
- L/C at sight acceptable for orders ≥ USD 50,000.
- Sample fee is refundable against confirmed order.
Logistics & Documentation
- Origin ports: Shenzhen, Guangzhou, Shanghai (Yantian preferred for FOB).
- Lane to {DESTINATION}: Yantian → Colombo / Dubai → {DESTINATION} port.
- Transit time: 18–25 days door-to-door (sea); 5–7 days (air).
- Documents supplied: Packing List, Commercial Invoice, Certificate of Origin, Bill of Lading, packing declaration, fumigation certificate if required.
Why Chart Mate
- 150 in-house production workers; 3,000 pcs/day capacity.
- Pantone Solid Chips Coated & Uncoated (PLUS Series) library on the production floor.
- ΔE < 2 color tolerance, batch-to-batch, verified under D65 light.
- 4-stage QC: incoming material → in-line → final inspection → pre-shipment.
- DDP lane tested via Colombo / Dubai — proven for resort, project, and corporate supply.
- English-fluent merchandiser assigned to every account from day one.
Next Steps
- Client confirms the 3 clarification points (luggage spec, Pantone references, packaging).
- Chart Mate issues itemized USD quotation within 48 hours.
- Counter-samples dispatched within 7 days of quotation approval.
- Golden sample sign-off + PO + deposit → production begins.
「Pick the engagement that fits your go-to-m…」
Contact our team for OEM/ODM support and a quick quote.



